Construction Loans for a Knockdown Rebuild

Understand demolition consent, construction loan approval, progress payments, equity and accommodation cash flow before rebuilding your Brisbane home.

No obligation. A consultant will call to discuss your needs.

After submitting, this browser can access brochures for 30 days without filling in this form again.

Speak to your lender before demolishing a mortgaged home. A construction loan may release money in stages as the replacement home is built, but demolition, your existing debt, valuation and cash contribution need to be addressed before work starts. Pre-approval is not the same as unconditional approval or permission to remove the existing security.

For families planning a knockdown rebuild in Brisbane, funding and design need to develop together. This is general information, not personal financial advice or a lending offer from Ownit. Ask a licensed lender or mortgage broker to assess your circumstances and explain the product's current terms.

Your existing home loan still matters

If your property secures a loan, removing the house changes that security. Tell the lender exactly what you propose, including demolition timing and how the replacement build will be funded. Do not assume a standard home-loan redraw or an approval in principle covers demolition.

Ask whether your current loan can remain, needs restructuring or refinancing, or must be incorporated into a construction facility. Fees, settlement timing, repayment obligations and consent requirements vary. Owning the land does not automatically mean enough equity is available to fund the whole project.

What the lender may need

Expect a property-specific assessment of your income, expenses, existing debt, proposed works and security. The lender may request a building contract, plans, specifications, cost breakdown, builder details, approvals and insurance information. Confirm its document list before treating a builder's start date as settled.

A valuation may consider the proposed completed home, subject to the lender's policy. It is not a guarantee of the price you could sell for, and it may leave a funding gap. Ask when your own funds must be contributed and what evidence is needed before the first payment.

How progress payments work

Construction loans commonly draw down progressively rather than releasing the entire approved amount at once. As one example, ANZ describes staged payments to the builder and interest on funds used during construction. That is a product example, not a description of every lender's rules.

The contract stages, invoices, lender approval and any inspections or valuation checks must align. Ask how to request a payment, how much lead time to allow and what happens if an invoice is disputed. A lender check does not replace your contract rights or independent building advice.

Plan the household cash flow, not just the approved limit

  • Existing mortgage repayments or interest that continues during the project.
  • Construction-loan interest as more funds are drawn, and repayments after completion.
  • Demolition, investigations and deposits that may fall due before construction funding is available.
  • Rent, bond, storage, moving, utilities and insurance while living elsewhere.
  • Variations, valuation gaps and a reserve for delays or unexpected work.

Ask the lender to model the overlap using your own figures. Interest-only payments are still payments, and a longer programme can increase the total holding cost even if the building contract price has not changed. Do not count the same savings as both your required contribution and your emergency reserve.

Get the sequence in writing

Before demolition, confirm consent to remove the existing house, the funding arrangements, outstanding approval conditions and how demolition will be paid. Before construction, confirm drawdown requirements and any commencement or completion deadlines. Products can have time limits, so ask how delays or design changes affect approval and whether an extension requires reassessment.

Keep the lender, builder and relevant advisers updated if the price, scope or programme changes. A manageable decision early can become a cash-flow problem if everyone assumes someone else has told the bank.

Finance questions to take to your adviser

Can equity cover the deposit?

Possibly, subject to valuation, serviceability and lender policy. Your equity is not an automatically available cash balance.

Will the construction loan pay for demolition?

Do not assume so. Confirm whether it is included, when funds can be released and whether you need another approved source of funds.

Does loan pre-approval mean we can start?

No. Check final approval, lender consent, drawdown conditions, insurance and required building or planning approvals before irreversible work.

Sources and further reading

Sources checked on 20 October 2026. Requirements and products can change. Confirm the current position for your property and circumstances.